I10, East Baton Rouge
Wednesday, February 13, 2013 at 9:55:00 AM
Wednesday, 2/13/13 (9 pm – 5 am)
• Lane Closures:
o I-10 WB left lane closure from the Bluebonnet overpass through the Essen overpass for barrier rail
o I-10 EB alternating lane closures from the 10/12 split through the fly over for striping
o I-10 EB alternating lane closures from the Bluebonnet overpass through the exception area for striping
• Street Closures:
o NB/SB Siegen lane reduced to one lane for deck drain installation
• Ramp Closures:
o EB Bluebonnet off ramp reduced to one lane for seeding
Thursday, 2/14/13 (9 pm – 5 am)
• Lane Closures:
o I-10 WB alternating lane closures from East of Siegen through the Essen overpass for striping
• Ramp Closures:
o WB Essen on ramp closure for barrier rail removal, striping and guard rail installation
? Detour: Essen north to I-12 WB on ramp to I-10 WB
o WB Essen off ramp closure for barrier rail removal and striping
? Detour: I-10 WB exit College U turn onto I-10 EB exit Essen
• Street Closures:
o NB/SB Siegen lane reduced to one lane for deck drain installation
Friday, 2/15/13 (10 pm – 6 am)
• Lane Closures:
o I-10 WB alternating lane closures from East of Siegen through the Essen overpass for striping
• Ramp Closures:
o WB Essen on ramp closure for barrier rail removal, striping and guard rail installation
? Detour: Essen north to I-12 WB on ramp to I-10 WB
o WB Essen off ramp closure for barrier rail removal and striping
? Detour: I-10 WB exit College U turn onto I-10 EB exit Essen
• Street Closures:
o NB/SB Siegen lane reduced to one lane for deck drain installation
Saturday, 2/16/13 (10 pm – 6 am)
• Lane Closures:
o I-10 WB alternating lane closures from East of Siegen through the Essen overpass for striping
• Ramp Closures:
o WB Essen off ramp closure for barrier rail removal and striping
? Detour: I-10 WB exit College U turn onto I-10 EB exit Essen
o WB Essen on ramp closure for barrier rail removal and striping
? Detour: Essen north to I-12 WB on ramp to I-10 WB
o WB Bluebonnet on ramp closure for barrier rail removal and striping
? Detour: I-10 EB feeder road to Picardy overpass onto I-10 WB Picardy on ramp
• Street Closures:
o NB/SB Siegen lane reduced to one lane for deck drain installation
Sunday, 2/17/13 (9 pm – 5 am)
• Lane Closures:
o I-10 WB alternating lane closures from East of Siegen through the Essen overpass for striping
• Ramp Closures:
o WB Essen off ramp closure for barrier rail removal and striping
? Detour: I-10 WB exit College U turn onto I-10 EB exit Essen
o WB Bluebonnet on ramp closure for barrier rail removal and striping
? Detour: I-10 EB feeder road to Picardy overpass onto I-10 WB Picardy on ramp
• Street Closures:
o NB/SB Siegen lane reduced to one lane for deck drain installation
These closures will allow vehicles 11-feet wide or less to pass through the construction zone.
I-10 Westbound will be open for regular traffic but oversize vehicles must detour using Exit 187 (US-61 North / Sorrento). Diverted traffic will be able to reach I-10 by traveling north along US-61, exiting onto I-12 Westbound and traveling west along I-12 until reaching I-10.
I-10 Eastbound will be open for regular traffic but oversize vehicles traveling east on I-10 must detour to I-12 at the 10/12 split, travel east along I-12, and use Exit 2A (US-61 South / Airline Hwy). Oversize vehicles traveling west on I-12 must detour using Exit 2A (US-61 South / Airline Hwy). Diverted traffic will be able to reach I-10 by traveling south along US-61 until reaching the I-10 on-ramp near Sorrento.
DOTD appreciates your patience and reminds you to please drive with caution through the construction site and to be on the lookout for work crews and their equipment.