La 3073 Ambassador Caffery/Chemin Metairie Intersection Redesign
Thursday, July 14, 2011 at 3:47:12 PM

Glenn Lege Construction poured the concrete paving for the turn lane and the turn-out bulb on the west side of the project.  They placed the last layer of asphalt base for the turn lane on the east side and the first layer of asphalt on the turn-out bulb on the east side.

Curb and gutter work should be lined up to pour on Friday with the rest of the concrete to be poured early next week.