LA 22: Near I-10 Geometric Improvement, Intermittent Lane Closures, Ascension Parish *UPDATED DATES*
Tuesday, December 03, 2019 at 3:41:37 PM
Construction for State Project H.011314 LA 22 in Ascension Parish for a length of 1.217 miles. The type of work required is clearing and grubbing, subgrade treatment, drainage structures, milling asphalt pavement, pavement patching, asphalt concrete pavement, portland cement concrete pavement, concrete walks and drives, dilled shaft foundations, traffic signalization, and related work.
The Louisiana Department of Transportation and Development advises motorists of the intermittent single lane closures on LA 22 between LA 70 & I-10 interchange, this will be night work. Closure times are listed below:
• Thursday, December 5, 2019, 7:00 PM – 5:00 AM, Friday, December 6, 2019
• Sunday, December 8, 2019, 7:00 PM – 5:00 AM, Monday, December 9, 2019
• Monday, December 9, 2019, 7:00 PM – 5:00 AM, Tuesday, December 10, 2019
• Tuesday, December 10, 2019, 7:00 PM – 5:00 AM, Wednesday, December 11, 2019
• Wednesday, December 11, 2019, 7:00 PM – 5:00 AM, Thursday, December 12, 2019
This closure is necessary to begin asphalt patching in both northbound and southbound lanes.
No oversized loads greater than 10’ wide will be allowed through the construction zone.
DOTD appreciates your patience and reminds you to please drive with caution through the construction site and be on the lookout for work crews and their equipment.
Scott Lobell, P.E., P.L.S.
Project Engineer ~ District 61
Office (225) 675-5320