Additional closures in red for travel lane repair
October 24, 2013 (9 pm to 5 am)
- I12 WB ramp to I10 EB closed for installation of temporary concrete barriers and impact attenuator for demo of concrete barrier rail at Essen tunnel.
- Detour: Continue I12 WB to I10 and u-turn at College Ave to I10 EB.
- Essen Lane ramp from I10 EB closed for installation of temporary concrete barriers and impact attenuator for demo of concrete barrier rail at Essen tunnel.
- Detour: Continue I10 EB to Bluebonnet and u-turn to I10 WB and return to Essen Lane.
October 25, 2013 (9 am to 3 pm)
- Right lane of Bluebonnet off ramp from I10 EB reduced to one lane for guardrail preparation.
- Right lane of Essen Lane off ramp from I10 WB reduced to one lane for concrete barrier demolition.
October 28, 2013 - November 1, 2013 (9 am to 3 pm)
- I10 WB at Essen Lane off ramp reduced to one lane from 9am-3pm for ditch paving.
- I10 EB at Essen Lane off ramp reduced to one lane from 9am-3pm for guardrail installation at Essen Tunnel.
- I10 EB at Bluebonnet off ramp reduced to one lane from 9am-3pm for guardrail installation.
October 31, 2013 (9 pm to 5 am)
- Right two lanes of I10 WB closed from Bluebonnet to past the Essen Off ramp.
- Bluebonnet on ramp to I10 WB closed.
- Detour: Travel EB service road to Siegen Lane and u-turn to I10 WB.
- Essen off ramp from I10 WB closed.
- Detour: Continue I10 WB to College exit and u-turn to I10 EB continuing to Essen Lane Exit.
November 1, 2013 & November 2, 2013 (10 pm to 6 am)
- Right three lanes of I10 WB including outside auxiliary lane will be closed from Bluebonnet to past the Essen Off ramp (inside lane will remain open).
- Bluebonnet on ramp to I10 WB closed.
- Detour: Travel EB service road to Siegen Lane and u-turn to I10 WB.
- Essen off ramp from I10 WB.
- Detour: Continue I10 WB to College exit and u-turn to I10 EB continuing to Essen Lane Exit.
These closures will allow vehicles 11-feet wide or less to pass through the construction zone.
I-10 Westbound will be open for regular traffic but oversize vehicles must detour using Exit 187 (US-61 North / Sorrento). Diverted traffic will be able to reach I-10 by traveling north along US-61, exiting onto I-12 Westbound and traveling west along I-12 until reaching I-10.
DOTD appreciates your patience and reminds you to please drive with caution through the construction site and to be on the lookout for work crews and their equipment.