$7.4 million rehabilitation project set to take place on La. 100 in Acadia Parish
Monday, March 10, 2025 at 2:39:04 PM
ACADIA PARISH, La. — The Louisiana Department of Transportation and Development (DOTD) announces that beginning Monday, March 17, 2025, construction will begin on a $7.4 million project that will include a 5.32-mile section of La. 100 from La. 97 to La. 91.

SCOPE OF WORK
The project will include clearing and grubbing, lime treatment, in-place cement treated subgrade, in-place cement treated base course, milling asphalt pavement, pavement patching, asphalt concrete overlay, drainage structures and related work.

TRAVEL IMPACTS
Work is expected to take place Monday through Friday from 7 a.m. to 5 p.m., weather permitting.

Intermittent lane closures will be required to perform the work, therefore, drivers should expect delays. The road will be open to regular traffic with a 12-foot maximum lane restriction on oversized loads passing through the work zone.

Emergency vehicles will have access through this area but may encounter delays.

The project is estimated for completion in winter 2025/2026.

SAFETY REMINDER
DOTD appreciates your patience and reminds you to please drive with caution through the construction site and be on the lookout for work crews and their equipment.

DOTD TRAVEL RESOURCES
DOTD has the following resources in place to assist motorists.

  • MyDOTD: Motorists can receive information on local projects, lane and road closures, and other DOTD activity by signing up for MyDOTD at www.dotd.la.gov.
  • 511 Traveler Information: Travelers can also find information regarding road closures and traffic by visiting www.511la.org or by dialing 511 from their telephone and saying the route or region about which they are seeking information. Out-of-state travelers can access the system by calling 1-888-ROAD-511 (1-888-762-3511).






###