LA 485: between I-49 and LA 6; Bridges near Allen; Natchitoches Parish; H.001820;
Thursday, January 04, 2018 at 9:48:18 AM
1/4/2018

Natchitoches Parish; LA 485: BRIDGES NEAR ALLEN
S.P. H.001820.6
CONTROL SECTION 115-01

The Louisiana Department of Transportation and Development (DOTD), advises the public that on Monday, January 8th, 2018 GeoEngineer’s Inc. will begin soil boring operations on LA 485 between I-49 and LA 6. The locations of the soil boring explorations require that one lane of LA 485 be closed temporarily to perform the work. The lane closure will be conducted in general accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and a flagger will be provided for traffic control. This work is expected to take about 2 weeks.

The contractor will be required to maintain thru traffic at all times, but periodic lane closures and delays can be expected. The public is advised to remain alert to construction signs and changing roadway conditions.

Permit/Detour Section
Thru traffic will be maintained and there will be no detour routes for this project.

Safety Reminder
DOTD appreciates your patience and reminds you to please drive with caution through the construction site and be on the lookout for work crews and their equipment.

Additional Information
Call (318) 561-5100 or (800) 542-3509 or 511 or visit www.511LA.org for additional information. Motorists may also monitor the LA DOTD website @ www.dotd.la.gov, by selecting MYDOTD, the Way to Geaux Application for iPhone or Android devices, the DOTD Facebook page or the LA DOTD Twitter page, @Alex_Traffic for further information and details.

Media Contact Information
Ms. Erin Buchanan, Public Information Officer
Grant, Natchitoches, Sabine, and Winn Parishes
Phone # 318-549-8402
Email: Erin.Buchanan@LA.GOV

Project Contact
Mr. David Pugh, Project Engineer
District 08, Gang 258
Office # 1-318-627-5522 or 1-318-627-5457
Email address: David.Pugh@LA.GOV